top of page

Portland House (30 High), Victoria

McLaren

Client

Landsec

Estimated Completion Date

Q4 2025

Sector

The 300,000 sq. ft tower, which is due to complete in 2025, has been designed to respond to the growing demand for sustainable, Grade A offices in amenity rich destinations. Located less than a minute’s walk from Victoria Underground Station, it is surrounded by world-class restaurants, shopping and leisure facilities and will deliver a range of amenity throughout the building.
Thirty High has been designed to be net-zero in both construction and operation and will target, NABERS 5*, WELL Core Gold and BREEAM ‘Outstanding’. By retaining the existing building structure, Landsec will achieve a c.60% reduction in embodied carbon compared to the current Greater London Authority benchmark. The building will be fully electric and powered by air source heat pumps, with all energy derived from fully renewable sources.

residential, commercial

bottom of page