![](https://static.wixstatic.com/media/1cf708_ecf32271dc6e476d9ce57d7a8a10136d~mv2.jpg/v1/fill/w_1357,h_1920,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/1cf708_ecf32271dc6e476d9ce57d7a8a10136d~mv2.jpg)
![](https://static.wixstatic.com/media/1cf708_5bda78a681c549bb86228087fdfe4ee5~mv2.jpg/v1/fill/w_733,h_400,al_c,q_80,enc_auto/1cf708_5bda78a681c549bb86228087fdfe4ee5~mv2.jpg)
stadia
London 2012 Olympic Stadium
London E20 2ST
Galostar Limited were honoured to contribute to such a prestigious globally renowned project.
The London Stadium (formerly and also known as the Olympic Stadium and the Stadium at Queen Elizabeth Olympic Park) is a multi-purpose outdoor stadium at Queen Elizabeth Olympic Park in the Stratford district of London. It is located in the Lower Lea Valley, 6 miles (10 km) east of central London. The stadium was constructed specifically for the 2012 Summer Olympics and 2012 Summer Paralympics, serving as the Athletics venue and as the site of their opening and closing ceremonies. Following the Games, it was renovated for multi-purpose use, and it now serves primarily as the home of Premier League club West Ham United.
Galostar Limited were honoured to contribute to such a prestigious globally renowned project.
Scope of works:
structural design
blockwork
London Olympic Delivery Authority
Client
Sir Robert McAlpine
Main Contractor
£2.4 million
Contract Value
Project Gallery
![](https://static.wixstatic.com/media/1cf708_0a89fb8c68fd4c5badb362de6c882e3a~mv2.png/v1/fill/w_450,h_450,q_90/1cf708_0a89fb8c68fd4c5badb362de6c882e3a~mv2.png)
![](https://static.wixstatic.com/media/1cf708_5c833173732749ff98569ec5447d6b15~mv2.jpeg/v1/fill/w_450,h_450,q_90/1cf708_5c833173732749ff98569ec5447d6b15~mv2.jpeg)
![](https://static.wixstatic.com/media/1cf708_c62f7014a67f4044a0207f477c187050~mv2.jpg/v1/fill/w_450,h_450,q_90/1cf708_c62f7014a67f4044a0207f477c187050~mv2.jpg)